Ashtech MobileMapper 10 Specifications Page 33

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 32
English
27
•On the Offset tab, you can set:
– The bearing, horizontal distance and vertical offset if
you wish to offset a point feature.
– The direction (left or right), horizontal distance and
vertical offset if you wish to offset a line or polygon
feature.
MobileMapper Field also allows the logging of two features to
be run concurrently (“double logging”). This can be done
through the appropriate use of the Pause/Resume/Stop
functions. Double logging is useful to reduce both the time
spent logging features and the distance walked in the field.
MobileMapper Field allows you to delete a logged feature
directly from the map screen showing the location of this
feature.
Prerequisites
• The receiver is on and MobileMapper Field running.
• A Map job is used, which contains three SHP layers: a
point layer named “Points”, a line layer named “Lines”
and a polygon layer named “Areas”. All layers are set to
be seen on the map screen.
• The units used have been set to meet your requirements.
• The reception status is good (number of satellites>6,
PDOP<3). Especially for MobileMapper 6 and
MobileMapper 10, optimum position accuracy is achieved
in real time after waiting about five minutes of good
Right
Bearing
Left
d= Horizontal Distance
d
d
d
N
1. Log
2. Pause
5. Resume
3. Log
4. Stop
6. Stop
Page view 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 71 72

Comments to this Manuals

No comments